LEED® certification is based on a point system. The amount of points achieved will determine which level of LEED® certification the project is awarded.
USGBC organizes the available points for LEED® certification into five broad categories. Below is a list of the categories and examples of required and possible points for each of the categories. USGBC also provides an optional sixth category for innovation and design process.
|
Sustainable Sites (14 Possible Points)
|
|
Prereq 1
|
Construction Activity Pollution Prevention
|
Required
|
|
Credit 1
|
Site Selection
|
1
|
|
Credit 2
|
Development Density & Community Connectivity
|
1
|
|
Credit 3
|
Brownfield Redevelopment
|
1
|
|
Credit 4.1
|
Alternative Transportation, Public Transportation Access
|
1
|
|
Credit 4.2
|
Alternative Transportation, Bicycle Storage & Changing Rooms
|
1
|
|
Credit 4.3
|
Alternative Transportation, Low Emitting & Fuel Efficient Vehicles
|
1
|
|
Credit 4.4
|
Alternative Transportation, Parking Capacity
|
1
|
|
Credit 5.1
|
Site Development, Protect or Restore Habitat
|
1
|
|
Credit 5.2
|
Site Development, Maximize Open Space
|
1
|
|
Credit 6.1
|
Stormwater Design, Quantity Control
|
1
|
|
Credit 6.2
|
Stormwater Design, Quality Control
|
1
|
|
Credit 7.1
|
Heat Island Effect, Non-Roof
|
1
|
|
Credit 7.2
|
Heat Island Effect, Roof
|
1
|
|
Credit 8
|
Light Pollution Reduction
|
1
|
|
|
|
|
|
Water Efficiency (5 Possible Points)
|
|
Credit 1.1
|
Water Efficient Landscaping, Reduce by 50%
|
1
|
|
Credit 1.2
|
Water Efficient Landscaping, No Potable Use or No Irrigation
|
1
|
|
Credit 2
|
Innovative Wastewater Technologies
|
1
|
|
Credit 3.1
|
Water Use Reduction, 20% Reduction
|
1
|
|
Credit 3.2
|
Water Use Reduction, 30% Reduction
|
1
|
|
|
|
|
|
Energy & Atmosphere (17 Possible Points)
|
|
Prereq 1
|
Fundamental Commissioning of the Building Energy Systems
|
Required
|
|
Prereq 2
|
Minimum Energy Performance Required
|
Required
|
|
Prereq 3
|
Fundamental Refrigerant Management Required
|
Required
|
|
Credit 1
|
Optimize Energy Performance
|
1-10
|
|
Credit 2
|
On-Site Renewable Energy
|
1-3
|
|
Credit 3
|
Enhanced Commissioning
|
1
|
|
Credit 4
|
Enhanced Refrigerant Management
|
1
|
|
Credit 5
|
Measurement & Verification
|
1
|
|
Credit 6
|
Green Power
|
1
|
|
|
|
|
|
Materials & Resources (13 Possible Points)
|
|
Prereq 1
|
Storage & Collection of Recyclables
|
Required
|
|
Credit 1.1
|
Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
|
1
|
|
Credit 1.2
|
Building Reuse, Maintain 95% of Existing Walls, Floors & Roof
|
1
|
|
Credit 1.3
|
Building Reuse, Maintain 50% of Interior Non-Structural Elements
|
1
|
|
Credit 2.1
|
Construction Waste Management, Divert 50% from Disposal
|
1
|
|
Credit 2.2
|
Construction Waste Management, Divert 75% from Disposal
|
1
|
|
Credit 3.1
|
Materials Reuse, 5%
|
1
|
|
Credit 3.2
|
Materials Reuse, 10%
|
1
|
|
Credit 4.1
|
Recycled Content, 10% (post-consumer + 1/2 pre-consumer)
|
1
|
|
Credit 4.2
|
Recycled Content, 20% (post-consumer + 1/2 pre-consumer)
|
1
|
|
Credit 5.1
|
Regional Materials, 10% Extracted, Processed & Manufactured Regionally
|
1
|
|
Credit 5.2
|
Regional Materials, 20% Extracted, Processed & Manufactured Regionally
|
1
|
|
Credit 6
|
Rapidly Renewable Materials
|
1
|
|
Credit 7
|
Certified Wood
|
1
|
|
|
|
|
|
Indoor Environmental Quality (15 Possible Points)
|
|
Prereq 1
|
Minimum IAQ Performance
|
Required
|
|
Prereq 2
|
Environmental Tobacco Smoke (ETS) Control
|
Required
|
|
Credit 1
|
Outdoor Air Delivery Monitoring
|
1
|
|
Credit 2
|
Increased Ventilation
|
1
|
|
Credit 3.1
|
Construction IAQ Management Plan, During Construction
|
1
|
|
Credit 3.2
|
Construction IAQ Management Plan, Before Occupancy
|
1
|
|
Credit 4.1
|
Low-Emitting Materials, Adhesives & Sealants
|
1
|
|
Credit 4.2
|
Low-Emitting Materials, Paints & Coatings
|
1
|
|
Credit 4.3
|
Low-Emitting Materials, Carpet Systems
|
1
|
|
Credit 4.4
|
Low-Emitting Materials, Composite Wood & Agrifiber Products
|
1
|
|
Credit 5
|
Indoor Chemical & Pollutant Source Control
|
1
|
|
Credit 6.1
|
Controllability of Systems, Lighting
|
1
|
|
Credit 6.2
|
Controllability of Systems, Thermal Comfort
|
1
|
|
Credit 7.1
|
Thermal Comfort, Design
|
1
|
|
Credit 7.2
|
Thermal Comfort, Verification
|
1
|
|
Credit 8.1
|
Daylight & Views, Daylight 75% of Spaces
|
1
|
|
Credit 8.2
|
Daylight & Views, Views for 90% of Spaces
|
1
|
|
|
|
|
|
Innovation & Design Process (5 Possible Points)
|
|
Credit 1.1
|
Innovation in Design
|
1
|
|
Credit 1.2
|
Innovation in Design
|
1
|
|
Credit 1.3
|
Innovation in Design
|
1
|
|
Credit 1.4
|
Innovation in Design
|
1
|
|
Credit 2
|
LEED Accredited Professional
|
1
|
 |
 |
 |